Monday, August 5, 2013

UPDATE: 2nd St. construction




 
As you can see construction on 2nd St. is moving forward today, removing the old railroad tracks that was used by General Dynamics.


 
The wood forms you see on top of the new warehouse floor that they already poured. Those are the walls that they call "Tilt Ups". This is something I helped my dad with when I was a kid, and in the back ground there is a Crain. Once the walls have dried they will left them up and secure them, along the new warehouse floor.
Once their done with 2nd. St. the street will be level, and new curbs and sidewalks will replace the old.  

No comments:

Post a Comment